Power

Sun in. Positions out.

A ring of solar cells under the clear top charges a sealed battery. Nothing to plug in, nothing to swap, nothing to bring in at night.5

The Hodalo tag seen from directly above in its light-grey cradle: an orange rim, a clear top over a dark ring of solar cells crossed by four thin orange spokes, and a square orange centre with an engraved h.
Solar ring

The dark ring is the power supply.

13cm² of solar cell under the clear top.1
about27days of reports from a lost boat, upright and with no sun, even if it goes missing at the end of a long day out of mobile range. A lost boat reports less often to save battery. An estimate.6
Estimates5

A cloudy week.

With poor sun and no mobile signal, the tag is estimated to keep reporting by satellite for the whole week.

When sun is poor, the tag slows its satellite reports to hold its battery.

  • Keeps reportingby satellite, with no mobile signal
  • Slows downsending less often, step by step, as the charge drops
  • Does not stopin the estimate. Figures for the week are still being worked out.

Designed to stay on the boat.

  • IP687

    Designed for 2 m under water for 24 hours.

  • −40 °C to +85 °C7

    Storage target. Designed to stay on the boat through winter.

  • 1,000 N7

    Target: a 1,000 N load on the top, for stepping and kneeling.

  • −20 °C7

    Target: reports from −20 °C. It charges between 0 °C and +60 °C.

Targets for the design. Not yet tested.

Talk to us

Know where every boat is.

If you run a resort, a camp or a rental dock, tell us about your site and your fleet, and we will tell you plainly whether Hodalo fits.

A short call, no slides. Or write to hello@hodalo.com.

The orange Hodalo tag in its light-grey cradle, seen from above at a three-quarter angle, with the cradle wall around its side.

Where we are

This is a plan, not a promise.

  1. Now Design on paper. No tag has been tested yet.
  2. Next Satellite link test from a real tag.
  3. Then Pilot season with a small number of sites, 10 tags per site.
  4. 2028 First paid deployments (target).